How do I transfer my service?

| FAQ

Do one of the following 2 business days before your move:

  1. Call Customer Service at (703) 335-7950
  2. Log in to your account, click on Requests/Updates, then click on Transfer Service 
  3. Visit our business office located at 4 County Complex Court in Woodbridge, Monday-Friday, 8 a.m.-5 p.m.  

Spinnaker Court Sewage Pumping Station, L02 and Force Main

| Capital Project
Project in Our Projects

The existing Spinnaker Court Sewage Pumping Station (SPS), constructed in 1970 as a wet well/dry well station, will be replaced to upgrade the SPS to the latest codes and standards as well as replace the aging structures and equipment. Five hundred feet of new six-inch force main will also be constructed to replace the aging four-inch force main discharging from the SPS to a manhole at Helm Court. The new station will serve the community for many years.

Occoquan River Crossing Project

| Capital Project
Project in Our Projects

The Occoquan River Crossing Project is a collaboration between three providers of drinking water: Fairfax Water, Prince William Water, and Virginia American Water. This project consists of designing and constructing two new 42-inch parallel water mains that will cross under the Occoquan River inside a 400-foot-long tunnel and connect to existing water mains on the Prince William County side of the river. In addition, a new water main will be installed to connect Fairfax Water’s Griffith Water Treatment Plant (located in Fairfax County) with the 42-inch water mains at the Occoquan River.

Route 1 Water Main Replacement Project

| Capital Project
Project in Our Projects

This project consists of the replacement of a water transmission main along Route 1 from the Garfield Booster Station (near the intersection of Route 1 and Neabsco Road) running south toward Fuller Heights Road. The purpose of this project is to increase transmission capacity from the Garfield Booster Station to southern portions of the Dumfries Pressure Zone, to improve system reliability and to meet customer demand.

H.L. Mooney Advanced Water Reclamation Facility-Wide Improvements

| Capital Project
Project in Our Projects

Prince William Water’s award-winning H.L. Mooney Advanced Water Reclamation Facility (AWRF) in Woodbridge treats up to 24 million gallons of wastewater daily, meeting or exceeding federal and state standards. After treatment at Mooney AWRF, the reclaimed wastewater is released into Neabsco Creek, a tributary of the Potomac River.