Invitation for Bid
Solicitation Number SA 2409
Closed

Project Description

The selected contractor will provide all materials, equipment, and labor necessary to construct Wellington Road Operations Center Expansion. The work includes, but is not limited to, the following:

  • Mobilization and Demobilization 
  • Demolition of existing items scheduled to be removed 
  • Clearing 
  • Erosion controls 
  • Site grading 
  • Construction of a 37,769 sf pre-engineered metal building with mezzanine 
  • Construction of a 3,108 sf Aggregate Storage Area
  • Drainage improvements, including storm sewer, a Stormtech Chamber stormwater management facility, and a Contech Continuous Deflection Separation (CDS) Best Management Practice (BMP) unit 
  • Installation of site improvements, including waterline, oil/water separator, and sanitary sewer lateral
  • Construction of a new left turn lane and entrance from Virginia Meadows Drive into the site 
  • Improved site lighting

 

Project Dates

Posted
Jan 31, 2024
Closed
Mar 19, 2024 10:00 AM EST